Pick the test, follow the procedure, record the numbers.
The first method won’t work here. We change approach, find the fault and explain what to do next.
A phase-to-ground fault tripped the cable differential relay. The cable was fully ducted, and the first test method was unsuitable. After a second approach and the right earthing, we located the fault at a single joint box. Opening the joint showed carbonisation and damage to the screen and insulation, exactly where the tests pointed.
The client got a documented location, repair recommendations and a post-repair testing plan.
Standards tell you what to test. We find the fault when site conditions don’t match the book.